Stephen Rees's blog

Thoughts about the relationships between transport and the urban area it serves

TransLink Titbits

with one comment

evergreen_line_map

1: Evergreen Line Bus Integration:

 

Bus route changes related to the Dec. 2 Evergreen Line opening will be introduced on Dec. 19. There are numerous changes to local routings along the line. Regional changes include:

    • Replace the 135 Burrard Stn-SFU route with 95 B-Line service along the same route. No word if all door boarding is part of the change.
    • Terminate the 160 Burrard Stn-Barnet Hwy-Port Coquitlam service at Kootenay Loop. It no longer will go downtown.
    • Eliminate the 97 B-line as it is mostly replaced by the Evergreen Line
    • Eliminate 190 Downtown-Barnet Hwy-Coquitlam service.
    • The N9 Broadway-Lougheed late evening service will be extended to Coquitlam Central, providing 24 hour service (a first for transit in Vancouver?)
    • Eliminate mid-day West Coast Express TrainBus service. It is replaced by the Evergreen Line and an extended route 701 from Coquitlam Central to Mission City.
  • Unrelated to the Evergreen Line but being implemented at the same time:
    • The 5/6 Davie/Robson becomes a circle route serving the West End, Pender St. and Yaletown. Public reaction to the Davie St. leg will be interesting as the route no longer serves downtown directly, something it has done since streetcar days, and its Expo Line connection becomes a walking transfer from Cambie St. and Dunsmuir St.  to Stadium-Chinatown Stn.
    • The C21/C23 Community Shuttle routes serving Davie St to Main St. Stn are replaced by  regular route 23 along Beach Ave. This is a frequent service route that improves service to an area that needs it.

2: Pattullo Bridge:

The Pattullo Bridge Replacement Project has completed Phase 2 of the Community Connections Consultation. There were 2,233 participant interactions in this phase – most of them through on-line feedback. TransLink has submitted the project to the province’s Environmental Assessment Office. More information at http://www.translink.ca/en/Plans-and-Projects/Roads-Bridges-and-Goods-Movement-Projects/Pattullo-Bridge/Pattullo-Bridge-Replacement.aspx.

3: Compass Card:

CTV News filed an FOI request with TransLink for correspondence with Cubic Corporation, the Compass Card vendor. Three TransLink letters were released but Cubic refused to release its responses. The letters document problems with the bus validators, fare gates and West Coast Express validators. TransLink stated that Cubic had not met the quality levels required for these items. There is no information on the resolution of the difficulties. However, the news item states that the difficulties led TransLink to implement the single fare zone for bus trips. It hints that TransLink is “revisioning [whatever that means] the tap-out on the bus” as the technology seems to be working satisfactorily now.

In an interview that is part of the CTV clip, TransLink’s Vice-President of Information, Lloyd Bauer, confirms that the Compass Card has increased fare revenues by 7% ($20 million in seven months).

This post courtesy of TransportActionBC 

Written by Stephen Rees

December 2, 2016 at 10:21 am

Posted in transit, Transportation

Tagged with ,

One Response

Subscribe to comments with RSS.

  1. the 95 B-Line will not be all door boarding, per @Translink on twitter,

    Brendan Dawe

    December 4, 2016 at 2:21 pm


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: